Warehouse Pad Aggregate Supply: Building Pad Preparation Built Around Your Pour Date

Warehouse pad select fill and flex base for tilt-wall pads, truck courts and drive aisles, sequenced to your pour schedule, with material + trucking on one call and your quote back within 24 hours.

Sheepsfoot roller compacting select fill on a building pad with a soil density gauge on the fill

Building Pad Preparation and Site Materials, Area by Area

A tilt-wall pour date drives the whole site. Pad first, then base, then paving, and each one is a different material with a different truck count. Here is each area with its material and spec line.

Building pad

Select fill goes in to the geotech's limits for plasticity index, gradation and compaction, and samples are available for your lab before the first load ships.

Spec: select fill meets the limits in your geotechnical report.

See select fill and how select fill gets lab tested.

Truck courts and dock aprons

Flex base goes under the heavy-wheel traffic at the dock and in the truck court, where loaded trailers turn and brake on the same patch every day.

Spec: Item 247 flex base.

See flex base.

Trailer parking and drive aisles

Parking fields and drive aisles take Item 247 base in whichever type and grade the paving detail names.

Spec: Types A and D, Grades 1 and 2.

See Type A and Type D flex base.

Fire lanes and site access

Crushed concrete makes the early access road that stays open in wet weather, so trucks can reach the pad before the paving goes in.

Spec: Type D crushed concrete, Item 247, where the plans name it.

See crushed concrete.

Utility tie-ins and trenches

Tie-ins and trenches need bedding and backfill: see utility line aggregate supply.

Pad perimeter and detention pond

Perimeter drainage and the detention pond need rock and fill: see drainage and detention aggregate supply.

Excavator shadow cast across a pile of red select fill dirt
Select fill for building pads. Samples available for your lab before delivery. Spec per your geotech report.
Loader beside a large flex base stockpile ready for truck loading
Type A flex base for truck courts and dock aprons. TxDOT Item 247, Grade 1 or 2.
Excavator loading red fill dirt into a dump truck at a pile
Fill loading out for a building pad. One full truckload, 15 to 25 tons.
Stockpile of crushed concrete base material
Crushed concrete for the early access road. Type D, Item 247, where the plans name it.

How It Works

  1. Send the pour date and the geotech. The tilt-wall pour date, the geotechnical report, the base and paving sections from the plans, and the site address.

  2. We match the report. We look for select fill that fits your geotech's limits and make samples available for your lab before the first load ships.

  3. Plan pad, base and paving as one schedule. Select fill and flex base each need a different number of trucks. At 15 to 25 tons a truck, the pad is a long run of loads and the dock aprons are a short one. We line them up behind your pour date.

  4. Trucks run to the pour. Owner-operators from our network haul each phase as it comes up. When the pour date slides, one contact moves every material with it.

Why Contractors Call Us

On a tilt-wall job the pour date drives everything. If the select fill is late, the base is late, and if the base is late, the paving crew sits.

Aggregates Now is the coordination layer for the whole pad. Fill, base and paving materials, the trucks for each, and one point of contact for all of it.

Three materials means three truck counts. Our network of independent owner-operators puts the trucks where the schedule needs them, heavy on the fill and lighter on the aprons.

Send the pour date and the geotech. We answer with a quote inside 24 hours.

Market Intel for Pad Builders

Where We Deliver

Pad builders get select fill and flex base from us in eight markets. Your market is below. A site out past the metro prices on haul distance, which also sets the truck count. Send the address and we price it.

Questions Pad Builders Ask

What fill goes under a warehouse slab?

Select fill that meets the plasticity index, gradation and compaction limits in your geotechnical report. The geotech sets the limits, not us. Send the report and we match the fill. Samples are available for your lab before delivery.

Can you send samples before the first truck?

Yes. Samples are available for your lab before delivery, so your engineer can test the fill before a load ships. Ask for them when you send the geotech report.

What base goes under truck courts and dock aprons?

Flex base, TxDOT Item 247, Type A limestone or Type D crushed concrete, Grade 1 or Grade 2, as the paving detail specifies. Heavy-wheel traffic is why the base matters here, so follow the section on the plans.

How do I schedule pad, base and paving material on one job?

Give us the pour date and the section for each layer. We plan the fill and the flex base as one schedule with a truck count for each. At 15 to 25 tons a truck, every order is at least one full truckload.

What do I use for a construction entrance and early access road?

Crushed concrete. It stays open in wet weather, so trucks reach the pad before paving. Use Type D under Item 247 where the plans name it.

Do you supply cement-stabilized sand, and where does it go on a site?

Yes. Cement-stabilized sand follows TxDOT Item 400, at least 7 percent cement by dry weight. On a pad site it goes only where your geotech or spec calls for it. Send us the section and we quote it.

Send the Pour Date. Get a Quote.

Send the pour date, the geotech and the plan sections. One quote comes back covering fill, base and trucking.