Road and Highway Aggregate Supply: Road Construction Materials to Plan Spec
Road base for civil work: TxDOT Item 247 flex base, crushed concrete, rock and fill, matched to your plan sheet and scheduled to your lane or phase window. Material + trucking, one call, and a quote within 24 hours.

Road Construction Materials for Each Part of the Job
Public road work runs on a plan sheet and a phase window. Here is what goes where, with the spec line for each.
New alignment base course
TxDOT Item 247 flex base is the base course on new alignment. Pick Type A limestone or Type D crushed concrete, Grade 1 or Grade 2, whichever the plans call for.
Spec: 1-1/2 inch down, with gradation reports available on request.
Widening and shoulders
Flex base builds the widened section under the new lane. Crushed limestone finishes the shoulder.
Spec: flex base follows Item 247.
Rehab and base repair
Flex base goes back for full-depth repair. Cement-stabilized sand goes in as roadway subbase where the spec calls for it.
Spec: cement-stabilized sand follows TxDOT Item 400, at least 7 percent cement by dry weight, as stated on the sand page.
Haul roads, detours and temporary access
Crushed concrete holds up in wet weather, which matters on a haul road or detour that has to stay open.
Spec: if the plans call for crushed concrete base, it ships as Type D under Item 247.
See crushed concrete.
Culverts, headwalls and outfalls
Rip rap armors the culvert ends, headwalls and outfalls where flow hits the ground.
Spec: rock size comes from your plan sheet. 15 to 25 tons a load.
Embankment and subgrade
Select fill and fill dirt build the embankment and bring the subgrade up to grade.
Spec: follow the embankment note on the plans.




How It Works
- 01
Send the spec and the phase plan. The Item number, type and grade or the plan sheet note, the quantity for each phase, the project limits and the lane or phase windows.
- 02
We match the spec. We check sources across multiple pits for material that meets your plan note, then price the material and the haul together. Gradation reports are available on request.
- 03
Set the loads by phase. A truck carries 15 to 25 tons, so a base lift becomes a count of loads and a shoulder pass becomes a smaller one. The minimum is one full truckload.
- 04
Trucks run your window. Our owner-operator network hauls to the lane or phase window you give us. When the phase moves, one call changes the date and the quantity.
Why Contractors Call Us
A lane closure or a phase window sets the day on public work. The base has to meet the plan spec on the first load, because a rejected load costs you the window.
Aggregates Now is the coordination layer between the pits, the trucks and your project. We find sources that fit the spec and line up trucks for each phase, so you deal with one contact instead of a pit, a hauler and a dispatcher.
Hauling runs on a network of independent owner-operators, so a big base lift gets more trucks and a short shoulder pass gets fewer.
Send the plan note and the phase quantities. The quote comes back within 24 hours.
Market Intel for Road Crews
- Dallas Is Starting $830M in Highway Work in 2026: Corridor work in the metroplex that will pull base and rock.
- Texas Approves a $138 Billion Ten-Year Road Plan: The long view on where TxDOT money lands.
- Texas Lands $756 Million for Rail Grade Separations: Read it if you sub on grade separation work.
- Waco I-35 Expansion Is Driving Road Base Demand in Central Texas: What Central Texas base demand means for supply.
- Federal Highway Funding Hits a Deadline on September 30: Why funding dates can move lettings and your start.
Where We Deliver
Road crews get flex base, rock and fill from us in eight markets. Choose yours below. On a county road far from a metro, the haul sets the price and the truck count. Send the project limits and we price the run.
Questions Road Crews Ask
Do you supply TxDOT Item 247 flex base for county and city jobs?
Yes. We supply Item 247 flex base for TxDOT, county and city work. Send the plan sheet note or spec section so we match the type and grade, and the project limits so we can price the haul.
Type A or Type D, and Grade 1 or Grade 2?
Your plans decide. Type A is crushed limestone and Type D is crushed concrete. We supply Types A and D, Grades 1 and 2, 1-1/2 inch down. Check the spec for the type and grade it allows, and we match it.
Can I get gradation reports with the load?
Gradation reports are available on request. Ask when you order so the report is ready for your inspector or lab.
What do I use for a haul road or detour?
Crushed concrete. It holds up in wet weather, which matters on a route that has to stay open. If the plans call for a specific base, follow the plans and tell us the spec.
How do I order for a phased job where each phase needs a different amount?
Give us the quantity for each phase and its lane or phase window. We plan loads per phase at 15 to 25 tons a truck, with one full truckload as the minimum. When a phase moves or the quantity changes, one call updates the order.
Where do you deliver for road work?
We deliver in Dallas, Fort Worth, Austin, San Antonio, Waco, Tyler, Abilene and Wichita Falls, and to rural project limits across our 66-county area in North and Central Texas, plus Oklahoma, Louisiana and Arkansas. Haul distance sets the price and the truck count.
Send the Plan Note. Get a Quote.
Send the spec, the quantities by phase and the project limits. You get one quote for material and trucking.