Rip Rap and Fill Sized to Plan for Detention Pond Construction

Drainage and detention aggregate supply: rip rap for detention ponds, culvert outlet and outfall rock, and select fill for the embankment, delivered in the order the pond is built. One call covers the rock, the fill and the trucks, and your quote lands within 24 hours.

Excavator placing large rip rap along a newly cut drainage channel bank

Detention Pond Construction, Part by Part

A pond has to pass inspection, and rip rap placement is part of it. The right size goes on the right part, and the rock and fill arrive in the order you build. Here is each part with its spec line.

Inlet and culvert aprons

6-inch rip rap, the 4x8 size, is the most ordered size for small outlet aprons and inlets. Permanent culvert aprons usually take 8x12.

Spec: limestone or recycled concrete, 15 to 25 tons a load.

See rip rap.

Spillway and outfall

A spillway and an outfall apron take 12x18 and larger rip rap, sized to the flow.

Spec: the size comes from your engineer's design.

See rip rap and the rip rap size guide.

Pond slopes and berms

Select fill builds the embankment, the slopes and the berms.

Spec: set by the pond design.

See select fill.

Channel lining and ditch checks

3x5 to 8x12 rip rap lines the channel and sets the ditch checks.

Spec: layer at least 1.5 times the median rock size.

See rip rap.

Bedding under rip rap

Geotextile fabric or a gravel bedding layer goes under the rock, as the plans call for. Your engineer's spec governs.

Pond finish

Screened topsoil goes on the graded slopes for seeding.

Spec: per your seeding plan.

See screened topsoil.

Stockpile of 12x18 rip rap rock beside a smaller pile of 8x12 rip rap
Rip rap, 8x12 and 12x18. Culvert outlet aprons and inlets. 15 to 25 tons a load.
Large 24x36 recycled concrete rip rap piled at a stockpile
Recycled concrete rip rap, 24x36. Spillways and outfalls, sized to the flow.
Red select fill dirt stockpile with an excavator working the pile
Select fill for the pond embankment. Slopes and berms, per the pond design.
Pile of screened topsoil at a screening plant
Screened topsoil for seeding pond slopes after grading. Per your seeding plan.

How It Works

  1. Send the pond details. The rip rap size at each culvert outlet, spillway and apron, the embankment section, the bedding note, and the order you plan to build in.

  2. We match size and source. We find limestone or recycled concrete rip rap in the sizes you list and select fill for the embankment, and we price the haul with it.

  3. Count the loads. A truck hauls 15 to 25 tons of rock or fill, and each order starts at one full truckload. Size the job first with the aggregate materials calculator.

  4. Loads follow the build. Our network of owner-operators runs fill while the embankment goes up and rock when the outlet is ready for it. If the schedule moves, one call moves the loads.

Why Contractors Call Us

A detention pond is a regulated structure, and the inspector looks at the rip rap. The size has to match the plan and the rock has to be on site when the outlet is ready for it.

We are the coordination layer for the pond build: the rock, the fill, the topsoil and the trucks for each, through one contact.

Hauling runs through our network of independent owner-operators. You do not chase a rock source for the outlet size and a separate hauler for the fill.

The quote is in your inbox within 24 hours of the request.

Market Intel for Pond Builders

Where We Deliver

Pond and drainage crews get rip rap, fill and topsoil from us in eight markets. Find yours below. Outside the metro, haul distance sets the price and the number of trucks. Send the outfall location and we price it.

Questions Pond Builders Ask

What size rip rap goes at a culvert outlet versus a spillway?

Your engineer sizes it to the flow. As a starting point, 6-inch rip rap, the 4x8 size, covers small outlet aprons, 8x12 covers most culvert outlets, and spillways and outfalls take 12x18 and larger. The plan sheet governs. Send it and we match the size.

Do I need bedding or fabric under the rip rap?

Your engineer's spec governs. The plans call for geotextile fabric or a gravel bedding layer under the rock. Follow the plan sheet, and tell us which it is so any bedding material is on the order with the rock.

What fill do I use for a detention pond embankment?

Select fill. Your pond design sets the requirements, so send the embankment section and we match the fill. The select fill page has the details.

What goes on the pond slopes after grading?

Screened topsoil for seeding the slopes, per your seeding plan. Order it after the grading is done so it lands on finished slopes.

Can you schedule rock and fill in the order the pond is built?

Yes. Give us your build sequence and the quantity for each stage, and we plan the loads to follow it. If a stage slips, call once and the loads move with it. Delivery timing is confirmed when you get the quote.

How many loads of rip rap for an outfall apron?

Multiply the apron length by width by layer thickness to get volume. The layer runs at least 1.5 times the median rock size, and your plan governs. Convert to tons with the aggregate materials calculator, then divide by 15 to 25 tons a load. Send the apron size and we confirm the count.

Send the Pond Details. Get a Quote.

Send the rip rap sizes, the embankment section and the build order. One quote covers rock, fill, topsoil and hauling.