
What Is Select Fill? A Texas Contractor Guide
Select fill is one of the most commonly specified and most commonly misunderstood materials on a Texas jobsite. It is not the same as
Notes from the Field
Market updates, material availability, and Texas construction intel. Published weekly for contractors.

Select fill is one of the most commonly specified and most commonly misunderstood materials on a Texas jobsite. It is not the same as

If you are asking how much road base you need, the honest answer is that it comes down to three numbers: your area, your

What TxDOT Item 247 flexible base is, the types and grades, and how Texas contractors spec and order flex base for road and pad work.

Crushed concrete vs road base for Texas jobsites. How the two differ on spec, strength, cost, and when to use each under pavement and pads.

What pipe bedding sand is, the right gradation for utility trenches, and how Texas contractors spec and order embedment sand for water and sewer lines.

Rip rap comes in 6 sizes from 3-inch to 24-inch. Here is how Texas contractors choose the right size for erosion control, drainage, and channel lining.

Select fill must meet geotechnical engineer specifications before it’s approved for use on Texas construction projects. Here’s what that means, why it matters, and how Aggregates Now handles sample delivery to your lab.
Market Intelligence
Market updates, material availability, and Texas construction intel. Published weekly for contractors.